
Business licence
Limited liability company registered in Shanghai. Unified Social Credit Code 91310117MA1J230PX4.
2023 · Shanghai Municipal Administration for Market Regulation
Home/Quality & certificates
Tyann operates under a construction enterprise qualification, a safety production licence and a portfolio of utility model patents covering the building systems we sell.
01Corporate licences
Click any certificate to view it full size. Original documents are available for verification on request.

Limited liability company registered in Shanghai. Unified Social Credit Code 91310117MA1J230PX4.
2023 · Shanghai Municipal Administration for Market Regulation
Specialised contracting for steel structure engineering, Grade II. Registered capital RMB 50 million.
D231676028 · valid to 4 June 2029
Licensed to carry out building construction work in the People's Republic of China.
(沪)JZ 安许证字〔2021〕181435 · valid 11 May 2024 – 10 May 202702Utility model patents
Granted by the China National Intellectual Property Administration between October and November 2021. Each patent corresponds to a detail we still build today.

A shed steel structure that can be assembled rapidly on site, reducing erection time and labour.
ZL 2021 2 0617074.5
An insulated wall build-up developed for the humidity and washdown conditions of pig housing.
ZL 2021 2 0013686.3
A truss-based structural system for livestock industry buildings, engineered for wide clear spans.
ZL 2021 2 0013689.7
A demountable roof truss detail that supports renovation and expansion of existing buildings.
ZL 2021 2 0617179.0
A poultry shed assembly combining thermal insulation with rapid on-site assembly.
ZL 2021 2 0617073.0
A support device that speeds up truss installation while keeping tolerances under control.
ZL 2021 2 0617140.903Quality control
Structural calculations and shop drawings are reviewed against the approved layout before fabrication starts.
Steel sections, panels, insulation and fixings are checked against the specification on receipt.
Cutting, forming, coating and hole positions are inspected and components labelled to drawing.
Component lists are counted against the packing schedule before containers are sealed.
Installation guidance and, where required, on-site supervision through to handover.
We can provide the qualification certificate, safety licence and patent certificates as verified copies for your procurement file.